Detailed Project Description:
- Project involved the initial make safe of a badly fire impacted warehouse containing pool chemicals. Large 2 level concrete tilt up panels had already fallen on neighbour properties during the fire.
- Initial works involved the removal of 4 x 2nd level concrete panels and the entire steel roof structure to make the area safe. The remaining panels were then propped
- Hazardous pool chemicals were removed and disposed of
- Structure was progressively dismantled by coring new lifting holes in panels and lifted out by cranage