Detailed Project Description:
- Water Corporation works involving the removal of an exisiting open drain and reinstating as a living river. Works included removal of existing retaining walls consisting of asbestos sheets, concrete panels steel sheet piling and timber panels. Emu pick and scrap sides and bottom of drain to remove any asbestos fragments. Recontour drain install new rip rap areas x 3, plant and mulch area. Install new drains and covers to drain opening.